Description
The aim of the lifting beam is to move, lift and transport loads of maximum 50,000 kg in a safe way through three different options at the top:
- Central hitch point with a 55t shackle directly or with a master ring.
- Central hitching point with a pair of 35t shackles on each side with a 2-leg sling and a main ring.
- Two hitch points with a pair of 35t shackles on each side with 2 crane hooks. Direct or with a master ring.
Bewertungen
Es gibt noch keine Bewertungen.